+212 5 22 72 81 99
contact@gtic-maroc.com
64, avenue Mohamed Bouziane, résid. Bahia, hay Mly Rachid
Home
Our projects
Our Services
Hydraulic piplines
Hydraulic structure and constructions
Electrical networks and constructions
High Quality Civil Engineering Works
developments of infrastructure
News
Contact
Realization and monitoring of road development works and various networks
of the Tranche I project of the green city mohamed IV
Home
Realization and monitoring of road development works and various networks
Realization and monitoring of road development works and various networks
Consistency
Sanitation networks, connections, and civil engineering works:: laying of 10,200 LM of pipes with a diameter between 75 mm and 400 mm
Drinking water networks: laying of 5120 LM of pipes with a diameter between 75 mm and 600 mm PN16
Irrigation networks: laying of 2200 LM of pipes with a diameter between 63 mm and 200 mm
Development of roads, sidewalks and parking
Connection of the various networks (Sanitation, AEP, Watering) on the existing networks.
Connection of new buildings to the main networks (Rental residences)
Client
: OCP
Maître d’ouvrage/Owner
: SADV
Year
: 2020 - 2023
Budget
: 44 MDH
Development of the Techparc located in the Green City Mohammed VI BENGUERIR
Realization and monitoring of road development works and sanitation networks