Greater Casablanca Anti-Pollution Project (SAP)

Depollution of eastern Casablanca
  • Awesome Image
  • Awesome Image
  • Awesome Image
  • Awesome Image
Awesome Image
Awesome Image
Awesome Image
Awesome Image

Greater Casablanca Anti-Pollution Project (SAP)

  • 4 km of sanitation in DN2500 mm by sinking without opening a trench
  • 11 attack wells (L 12m x W 6m x H 14m) in the presence of groundwater and saline water

 

Structural work and basin:

  • Sea water
  • Sealed to prevent groundwater pollution
  • Pollution of the fishing harbour (draconian EEC standards) the water table

Laying a DN2500 mm concrete pipeline with a tunnel boring machine at an average depth of 9 meters in the presence of groundwater:

  • Work in an urban environment on Morocco’s busiest road for heavy goods vehicles.
  • Laser-guided precision work with a slope of 0.2 to 0.3%.

Construction of drinking water reservoir

2x 10,000 m3 – Delay: 18 months ( Under construction )

Consistency

- Realization of 03 Large Interceptors (Covered basins in reinforced concrete with double sealing and resistant to saline water).
- Basins also subject to groundwater pressure. Works carried out in high co-activity and in a high traffic axis

  • Type of work : GC
  • Client : LYDEC/ Wilaya du Grand-Casablanca
  • Maîtrise d’oeuvre : Suez Consulting (Ex SAFEGE)
  • Year : 2015
  • Budjet : 206 MDH